last data update: 2011/10/20, 15:08
Website loading time
during the test: 1.78 s
cable connection (average): 1.98 s
DSL connection (average): 2.18 s
modem (average): 12.83 s
HTTP headers
HTTP/1.1 200 OK
Date: Thu, 20 Oct 2011 22:00:52 GMT
Server: Apache
Last-Modified: Thu, 20 Oct 2011 12:17:49 GMT
ETag: "9a0016-13561-4afb9f1e57540"
Accept-Ranges: bytes
Content-Length: 79201
Connection: close
Content-Type: text/html; charset=utf-8
X-Pad: avoid browser bug
Information about DNS servers
gazprom.com | A | 217.151.130.37 | IN | 43200 | |
gazprom.com | MX | 10 | mailrelay.gazprom.ru | IN | 43200 |
gazprom.com | SOA | ns.gazprom.ru | polyakov.gazprom.ru | 2009062602 | 3600 7200 604800 86400 IN 43200 |
gazprom.com | NS | ns.gazprom.ru | IN | 43200 | |
gazprom.com | NS | ns2.gazsvyaz.ru | IN | 43200 | |
gazprom.com | NS | ns1.gazsvyaz.ru | IN | 43200 |
Received from the first DNS server
Request to the server "gazprom.com"
You used the following DNS server:
DNS Name: ns.gazprom.ru
DNS Server Address: 217.151.130.34#53
DNS server aliases:
HEADER opcode: REQUEST, status: NOERROR, id: 25272
flag: qr aa rd ra REQUEST: 1, ANSWER: 6, AUTHORITY: 0, ADDITIONAL: 4
REQUEST SECTION:
gazprom.com. IN ANY
ANSWER SECTION:
gazprom.com. 86400 IN SOA ns.gazprom.ru. polyakov.gazprom.ru. 2009062602 3600 7200 604800 86400
gazprom.com. 86400 IN NS ns.gazprom.ru.
gazprom.com. 86400 IN NS ns1.gazsvyaz.ru.
gazprom.com. 86400 IN NS ns2.gazsvyaz.ru.
gazprom.com. 86400 IN MX 10 mailrelay.gazprom.ru.
gazprom.com. 86400 IN A 217.151.130.37
SECTION NOTES:
ns.gazprom.ru. 86400 IN A 217.151.130.34
ns1.gazsvyaz.ru. 600 IN A 217.151.128.34
ns2.gazsvyaz.ru. 600 IN A 217.151.128.35
mailrelay.gazprom.ru. 86400 IN A 217.151.130.35
Received 252 bytes from address 217.151.130.34#53 in 129 ms
Received from the second DNS server
Request to the server "gazprom.com"
You used the following DNS server:
DNS Name: ns2.gazsvyaz.ru
DNS Server Address: 217.151.128.35#53
DNS server aliases:
HEADER opcode: REQUEST, status: NOERROR, id: 63443
flag: qr aa rd ra REQUEST: 1, ANSWER: 6, AUTHORITY: 0, ADDITIONAL: 4
REQUEST SECTION:
gazprom.com. IN ANY
ANSWER SECTION:
gazprom.com. 86400 IN SOA ns.gazprom.ru. polyakov.gazprom.ru. 2009062602 3600 7200 604800 86400
gazprom.com. 86400 IN A 217.151.130.37
gazprom.com. 86400 IN MX 10 mailrelay.gazprom.ru.
gazprom.com. 86400 IN NS ns.gazprom.ru.
gazprom.com. 86400 IN NS ns2.gazsvyaz.ru.
gazprom.com. 86400 IN NS ns1.gazsvyaz.ru.
SECTION NOTES:
mailrelay.gazprom.ru. 86400 IN A 217.151.130.35
ns.gazprom.ru. 86400 IN A 217.151.130.34
ns1.gazsvyaz.ru. 600 IN A 217.151.128.34
ns2.gazsvyaz.ru. 600 IN A 217.151.128.35
Received 252 bytes from address 217.151.128.35#53 in 136 ms
Subdomains (the first 50)
Typos (misspells)
fazprom.com vazprom.com bazprom.com hazprom.com yazprom.com tazprom.com gzzprom.com gszprom.com gwzprom.com gqzprom.com gaxprom.com gasprom.com gaaprom.com gazorom.com gazlrom.com gaz-rom.com gaz0rom.com gazpeom.com | gazpdom.com gazpfom.com gazptom.com gazp5om.com gazp4om.com gazprim.com gazprkm.com gazprlm.com gazprpm.com gazpr0m.com gazpr9m.com gazpron.com gazprok.com gazproj.com azprom.com gzprom.com gaprom.com gazrom.com | gazpom.com gazprm.com gazpro.com agzprom.com gzaprom.com gapzrom.com gazrpom.com gazporm.com gazprmo.com ggazprom.com gaazprom.com gazzprom.com gazpprom.com gazprrom.com gazproom.com gazpromm.com |
Location
IP: 217.151.130.37
continent: AS, country: Russian Federation (RUS), city: Moscow
Website value
rank in the traffic statistics:
There is not enough data to estimate website value.
Basic information
website build using CSS
code weight: 77.34 KB
text per all code ratio: 23 %
title: Gazprom
description:
keywords:
encoding: utf-8
language: en
Website code analysis
one word phrases repeated minimum three times
Phrase | Quantity |
---|---|
and | 86 |
Gazprom | 49 |
gas | 44 |
the | 29 |
for | 24 |
with | 20 |
Alexey | 20 |
Miller | 19 |
Stream | 14 |
September | 13 |
in the | 13 |
supplies | 12 |
The | 11 |
Gazprom’s | 11 |
on the | 10 |
Program | 9 |
production | 9 |
of the | 9 |
Russian | 8 |
Gas | 8 |
are | 8 |
from | 8 |
between | 8 |
cent | 7 |
project | 7 |
Belarus | 7 |
Oblast | 7 |
South | 7 |
Investment | 6 |
discuss | 6 |
CIS | 6 |
LNG | 6 |
natural | 6 |
first | 6 |
projects | 6 |
supply | 6 |
transgaz | 6 |
its | 6 |
transmission | 6 |
Nord | 5 |
gasification | 5 |
new | 5 |
European | 5 |
development | 5 |
sign | 5 |
facilities | 5 |
cooperation | 5 |
Sakhalin | 5 |
2011 | 5 |
field | 5 |
of Gazprom | 5 |
Europe | 4 |
of Russian | 4 |
October | 4 |
markets | 4 |
over | 4 |
Negotiations | 4 |
prospects | 4 |
site | 4 |
International | 4 |
Shtokman | 4 |
being | 4 |
Baltic | 4 |
to the | 4 |
Company | 4 |
pipeline | 4 |
dobycha | 4 |
market | 4 |
into | 3 |
industry | 3 |
Agreement | 3 |
level | 3 |
grows | 3 |
Group | 3 |
Committee | 3 |
In order | 3 |
Conference | 3 |
offshore | 3 |
Management | 3 |
energy | 3 |
results | 3 |
Asia-Pacific | 3 |
market. | 3 |
countries | 3 |
in 2011 | 3 |
New | 3 |
4th | 3 |
Board | 3 |
San | 3 |
strategy | 3 |
of Directors | 3 |
states | 3 |
II | 3 |
confirm | 3 |
joint | 3 |
demand | 3 |
Energy | 3 |
Games | 3 |
Alexander | 3 |
Summer | 3 |
Spartakiada | 3 |
partners | 3 |
two word phrases repeated minimum three times
Phrase | Quantity |
---|---|
Alexey Miller | 19 |
Gazprom and | 18 |
Miller and | 18 |
between Gazprom | 7 |
with Belarus | 6 |
gas supplies | 6 |
South Stream | 6 |
natural gas | 6 |
Nord Stream | 5 |
CIS and | 5 |
prospects for | 4 |
and Baltic | 4 |
gas production | 4 |
Negotiations with | 4 |
Management Committee | 3 |
Board of Directors | 3 |
with the | 3 |
Baltic states | 3 |
Oblast September | 3 |
4th Summer | 3 |
Spartakiada Games | 3 |
and Gas | 3 |
Games of Gazprom | 3 |
gas transmission | 3 |
gas supply | 3 |
Oblast gasification | 3 |
Sakhalin II | 3 |
Stream gas | 3 |
three word phrases repeated minimum three times
Phrase | Quantity |
---|---|
Alexey Miller and | 18 |
between Gazprom and | 7 |
CIS and Baltic | 4 |
Spartakiada Games of Gazprom | 3 |
and Baltic states | 3 |
Negotiations with Belarus | 3 |
B tags
en
U tags
I tags
images
file name | alternative text |
---|---|
gazprom_logo_en.png | Gazprom |
gazprom_logo_en_print.png | |
logo-en.png | Blue Corridor 2011 motor rally started in Yekaterinburg |
07-09-2011_banner-copy-5-en.png | Alexey Miller |
rostrum.png | Participant of Blue Corridor 2011 motor rally started in Yekaterinburg |
urlStockGraph-en.png | Eizo Kobayashi (second from right), President of Itochu Corporation during working meeting with Alexey Miller |
h44_ge7_7832.jpg | Working meeting between Alexey Miller and Masami Iijima, President and Chief Executive Officer of Mitsui |
w82_2011-11-19.jpg | Paolo Scaroni, Chief Executive Officer of Eni (center) at working meeting with Alexey Miller |
miller.png | The Gazprom Management Committee has reviewed the Unified Gas Supply System facilities readiness for the 2011–2012 autumn/winter period |
gazprom-mainpage-rostrum.png | Vasily Golubev, Governor of Rostov Oblast at working meeting with Alexey Miller |
gazprom-mainpage-piechart.png | Karen Oganyan has been appointed Head of the Tax Policy Department |
icons-snowflake.png | Working meeting between Alexey Miller and Lee Yun-ho, Ambassador Extraordinary and Plenipotentiary of Republic of Korea to Russia |
w310_ge3_8261.jpg | Working meeting between Alexey Miller and Ion Ariton, Romanian Minister of Economy, Trade and Business Environment |
w310_cdm40368_edit.jpg | The 2011 Best Corrosion Prevention Expert vocational skills competition |
w310_cdm40468_edit.jpg | 2011 Gazprom Best Welder skills competition |
w310_dsc_6860.jpg | Rinat Bayriev acknowledged as Gazprom’s Best Welder in 2011 |
w310_ks-11_mart_2006_(12).jpg | The meeting was dedicated to establishing the Yakutia gas production center as part of the Eastern Gas Program. |
w310_dsc_6807_1.jpg | Viktor Timoshilov delivering speech at 15th Sakhalin Oil and Gas 2011 International Conference |
w310_main_1.jpg | Alexander Medvedev (right) delivering a speech at the 15th Sakhalin Oil and Gas 2011 International Conference |
h220_cdm40174.jpg | Top managers from foreign gas companies visit Gazprom’s facilities in Far East |
h220_cdm40118.jpg | Alexander Ananenkov moderated the meeting dedicated to the issues of designing and constructing in Northwestern Russia the Ukhta – Torzhok, Pochinki – Gryazovets, Gryazovets – Vyborg, SRTO – Torzhok gas pipelines, line compressor stations and expanding the Gryazovets gas transmission hub as well as visited the Portovaya CS construction site, accompanied by a group of Gazprom |
w310_ge3_7597.jpg | Alexey Miller moderated a meeting dedicated to the cooperation of Gazprom and Russian pipe manufacturers on the basis of Chelyabinsk Pipe Rolling Plant |
urlMonthStockGraph-en.png | Working meeting between Alexey Miller and Oleg Korolyov, Chairman of Lipetsk Oblast Government |
h75_umgp_081.jpg | Gazprom is participating in International Investment Forum “Sochi – 2011” |
h75_gtmsk_028.jpg | Henri Proglio, Harald Schwager, Vladimir Putin, Alexey Miller and Paolo Scaroni during signing of Shareholder Agreement for offshore section of South Stream project |
h75_gtmsk_041.jpg | Gazprom and Kogas have signed Roadmap on project for pipeline gas supply to Korea |
h75_umgp_001.jpg | Alexey Miller and Kim Hui Yong have discussed implementation of project for gas transmission from Russia to Korean Peninsula |
h220_gtmsk_028.jpg | Working meeting between Alexey Miller (right) and Alexander Mikhailov, Governor of Kursk Oblast |
w310_img_3373_1.jpg | Working meeting between Alexey Miller and Valery Shantsev, Governor of Nizhny Novgorod Oblast |
w310__dsc6557.jpg | Working meeting between Alexey Miller and Yegor Borisov, President of Republic of Sakha (Yakutia) |
w310__dsc6379.jpg | 31st plenary meeting of Technical Committee for Standardization – ISO/TC 67 “Materials, Equipment and Offshore Structures for Petroleum, Petrochemical and Natural Gas Industries” |
w310_img_0227.jpg | Working meeting between Alexey Miller and Anatoly Brovko, Head of Volgograd Oblast Administration |
w310_20110925_0169.jpg | 4th Summer Children’s Spartakiada Games of Gazprom adjourns |
w310_izobrazhenie_222.jpg | Сelebrations dedicated to the commissioning of the first startup complex at the Sakhalin – Khabarovsk – Vladivostok gas transmission system |
h220_cdm40426.jpg | Gazprom Group to open its representative office in Kyrgyzstan |
w310_cdm40299.jpg | Festive opening of 4th Summer Children’s Spartakiada Games of Gazprom |
w310_cdm40995_edit.jpg | Celebrations dedicated to start of natural gas feeding into first string of Nord Stream gas pipeline |
w310_dsc_0931_1.jpg | Working meeting between Alexey Miller and Vladimir Artyakov, Governor of Samara Oblast |
w310_dsc_0811_1.jpg | Alexey Miller delivered a message at a conference call dedicated to Oil and Gas Industry Workers Day |
w310_dsc_0571_edit.jpg | |
w310_dsc_0725.jpg | |
w310_dsc_0680.jpg | |
w310_img_3845.jpg | |
w310_dsc_0509_edit.jpg | |
w310_bp6y8951.jpg | |
w310_rian_00955730.lr.ru.jpg | |
w310_img_8832_1.jpg | |
w310_dsc_5765_1.jpg | |
w310_kor_2523_1.jpg | |
w310_cdm40028_1.jpg | |
h220_cdm40207_1.jpg | |
artlebedev-logo.png | |
1485489 |
headers
H1
H2
Comments by analysts and experts
News
September 2011
H3
Comments by analysts and experts
News
September 2011
H4
September highlights
H5
H6
internal links
external links